The crane equipment operation of Hand Boat Winch Factory can generally be divided into three types: idling test, load test and precision test.
(1) Idling test: It is to check the persistence of the crane equipment accuracy, the stability of the crane equipment, and whether the transmission, operation, control, lubrication, hydraulic and other systems are normal, and the relevant parameters and performance of the operation are reliable. Beethoven's work. The no-load operation at a certain time is an indispensable process that must be run-in before the new crane equipment is put into use.
(2) Load test of crane equipment: The test crane equipment is tested under several standard load conditions, and in some cases. In the load test, the temperature rise of the bearing should be checked according to the standard, and whether the hydraulic system, transmission, operation, control, safety and other crane equipment operations have reached the factory standard, and whether it is normal, safe and reliable. Trial operations under different load conditions are also all necessary operations for the running-in of the new crane equipment. The quality of the running-in test has a great influence on the service life of the crane equipment.
(3) Accuracy test of Jiaxing crane rental equipment: generally, it should be carried out according to the rules of the manual after the load test. It is necessary to check not only the geometric accuracy of Cargo Bar Manufacturers itself, but also the accuracy of the operation (processed products).